How to label work in progress in a freelance portfolio
A prototype, proposal and launched project are different stages. Label the stage so readers do not infer a result that has not happened.
State the project stage near the title
Use a direct label such as “prototype”, “in progress”, “paused” or “concept project” when it changes how a reader should interpret the work. Add the date or project period so the status has context.
Do not use “launched”, “delivered” or “implemented” for work that stopped at a proposal or prototype. A clear status is more useful than language that makes the project appear more complete.
Separate completed work from intended outcomes
Describe what you actually finished: research, a design system, a tested prototype, documentation or a handover. If a future target was discussed but not measured, call it a goal rather than a result.
When a team or client owns the next stage, say where your responsibility ended. Do not imply adoption, revenue, launch or performance gains without evidence that the event occurred and permission to share it.
Explain why the example still matters
A project can demonstrate useful thinking even when it did not launch. Explain the constraint, your decisions and the deliverable a reader can inspect; do not invent a successful ending to make the story feel complete.
The National Careers Service advises keeping CV details relevant and accurate. Apply that principle to portfolio case studies: label the stage, explain your contribution and keep every claim tied to the work you can show.
UK considerations
This is general CV guidance. Follow the UK employer, client or application system’s instructions, especially when it requests a specific format or set of details.
Keep project status and deliverables clear in your work history. Create your CV with entries you can explain and verify.